QP’s EPIC PROJECT AT RAS LAFFAN

Roads and Infrastructure

Client:

Qatar Petroleum

Consultant:

Project Duration:

27 Months

Year Completed:

2015

Brief Description

The Scope of Work is to carry out Engineering, Procurement, Construction, Installation, Testing, Pre-Commissioning and Commissioning to complete the Construction Works for the following three sites:

• Joint Forces Building.

• Government Building.

• Coast Guard Telecom Building.